LLT - "An Inspector Calls" - Set Design & Construction Schedule (as of November 19, 2003)
October November December January
Task 13-19 20-26 27-31/ 1-2 3-9 10-16 17-23 24-30 1-7 8-14 15-21 22-28 29-31 1-4 5-11 12-18
                                 
SET CONSTRUCTION:                                
- Establish Set Plan
                             
- Inventory Existing Flats/Sets
                       
- Develop Elevation Views
                     
- Complete/Approve Design                      
- Identify Basic Flats
                       
- Identify Special Sets
                       
- Design Special Sets
 
           
               
- Obtain Materials
 
                             
- Test Crack Concept(s)
                               
- Construct Special Sets
                               
- Paint Special Sets
                               
- Const. Nec. New Basic Sets
                               
- Paint All Flats/Sets
                   
       
- Assemble All On Stage                    
       
                                 
SET FURNITURE/DÉCOR:                                
- Identify/List All F&D
       
                     
- Identify Source of All
         
                 
- Obtain All Items
           
             
- Modify Items as Required
         
- Install/Place on Stage          
                                 
SET COMPLETION:                                
- Coordinate with Others
                               
- Test & Revise                                
- Complete Total Set
                       
     
- Maintain Thru Performance
                               
- Remove Set from Stage
                               
- Return Borrowed Items
                               
                                 
TEAM MEETINGS: